Star post sorted.
Opto I'm not 100% on it. It seems good, will have to wait and see.
2 straight 12 hour days.
Did the following.
- Full playfield strip
- GI replaced with comet frosted white
- Inserts replaced with LEDs
- Removed old mylar with freeze method (zero damage!)
- Rebuilt 5 Bank Target mech, previous person used a short coil sleeve and skipped put on c clips resulting in a loose mech which kept jamming the targets
- Full playfield clean after strip
- Metal polished all lane guides
- Tumbled all screws, posts and nuts, those which came out dull and manky were replaced
- Replaced snapped post
- Replaced slingshot posts these were the wrong height
-Replaced crane plastic with JD mods crane mod
- Added reactor mod but awaiting plastic as original is trashed with someone's expanding glue bodge job.
- Sanded down a bodge job bond on the left side ramp entrance, reinforced with an adhesive.
- Metal polished the wire forms
- Cleaned all plastics
- Replaced balls
- Added some new mylar in spots beginning to show wear
- Resolved some wiring issues on the extra ball and left launch button
- Replaced leg levellers
- New rubber set
- LEDs for Translite
Stuff left to do:
Cab decals (Decals ordered)
Powder coat lockbar, legs and side rail
Topper
Not bad for 2.5 days total