On to the next restoration. This one is sticking to the original decal design, will be good to see original VS. re-theme next to each other.
Cabinet:
Backbox:
Playfield:
I'll update this once I've had a dig around.
Cabinet:
- Cabinet Restoration
- New Cabinet Decals
- Interior Restore + Paint Job
- Powder Coated Cabinet exterior and Interior metals
- New Cabinet Braid
- New leg plates
- New leg bolts
- New Leg levellers
- New Side Rails
Backbox:
- New Backbox decals
- Re-wiring/Re-pinning of 'J' Headers
- Assessment of PCB's in backbox for Cap replacement etc.
- Powder Coat of Backbox metal
Playfield:
- Playfield Swap,replace any broken posts etc.
- Complete new plastics set
- New Playfield Rubbers
- LED assessment/replace to match themeing
- Underside Mech cleaning/assessment for replacement
- New opto interruptor
- New Trap door bracket and trap door
- Tumble/Polish metals
- Apron Powder coated
I'll update this once I've had a dig around.