Yayy - after much delay (about a year thanks to covid induced job losses & covid induced extra business for the building trade), work on the pinservatory starts tomorrow 
Currently looks like this

With all that glass, it is stupidly hot in summer & stupidly cold in the winter, so all we're really doing is having the roof changed for a solid one with some insulation. I'm going to miss the fairy lights, though - we put them up a few Christmases ago & decided to leave them up permanently.

All empty now & ready for the guys to start - reckon I can get 10 in there at a push, but I'd have to lose the sofa


Currently looks like this



With all that glass, it is stupidly hot in summer & stupidly cold in the winter, so all we're really doing is having the roof changed for a solid one with some insulation. I'm going to miss the fairy lights, though - we put them up a few Christmases ago & decided to leave them up permanently.


All empty now & ready for the guys to start - reckon I can get 10 in there at a push, but I'd have to lose the sofa

