Well today at around 2pm I got a call from hadfield to say my GnR would be here in 30mins.
To make matters worse my JP arrived yesterday and took the last available space so I had to take matters into my own hands so this:


Quickly turned into this:
Moved my shelving in garage that will become the pin in/out access




Removed my speakers, screen, stage and wallpaper

With all the tech gear gone I pulled the lower half of the wall down which was carpeted for audio reasons aswell as the flooring and skirting board.


Although I originally intended a high end finish it will all have to be a quick fix for now so Tomorrow will see me getting some deco gear and ordering some decent oak flooring.
Been a long day so far now to sort the garage mess before bed and try make the missus smile as she wasn’t best pleased when she came home from work lol

To make matters worse my JP arrived yesterday and took the last available space so I had to take matters into my own hands so this:


Quickly turned into this:
Moved my shelving in garage that will become the pin in/out access




Removed my speakers, screen, stage and wallpaper

With all the tech gear gone I pulled the lower half of the wall down which was carpeted for audio reasons aswell as the flooring and skirting board.


Although I originally intended a high end finish it will all have to be a quick fix for now so Tomorrow will see me getting some deco gear and ordering some decent oak flooring.
Been a long day so far now to sort the garage mess before bed and try make the missus smile as she wasn’t best pleased when she came home from work lol
